← Long Island Marathon·2 nights

After the Long Island Marathon: Manhattan by Rail

Two nights in the city, with the park, a great museum and a famous bridge.

Duration2 nights
TransitThe Long Island Rail Road to the city
DepartsEast Meadow

After the Long Island Marathon: Manhattan by Rail

The Route: East Meadow by road to a Long Island Rail Road station, then rail to Manhattan Logistics: Rail and local transport; check the Sunday timetable and the last mile from the park Marathon Month: May Duration: 2 nights

East Meadow ──► Long Island Rail Road ──► Manhattan
 (the park)       (rail, Penn Station or      (Central Park, the Met,
                   Grand Central Madison)      Brooklyn Bridge)

The Long Island Rail Road is a publicly owned commuter railroad run by the MTA, with 11 passenger branches, 126 stations and 319 route miles, from Manhattan to the eastern tip of Suffolk County. It is one of the few commuter systems that runs around the clock. Two terminals serve Manhattan. Penn Station is the busiest, with almost 500 daily trains, and Grand Central Madison, an eight-track terminal under Grand Central Terminal, opened for limited shuttle service on 25 January 2023 and for full service on 27 February 2023. Check which terminal your train uses.

Jamaica is the transfer hub, where passengers can change between trains on all lines except the Port Washington Branch. If you are flying home from John F. Kennedy International Airport (JFK), the AirTrain connects with the rail network there.

May in Manhattan. The Central Park normals give a daily maximum of about 22 °C and a minimum of about 13 °C, with around 101 mm of rain across the month. Carry a light waterproof.

Night one: Manhattan

Choose a base near Penn Station or Grand Central, depending on which terminal your train uses, and use a refundable rate. Check the walking distance from the station to your hotel, since stairs after a marathon are a nuisance.

Central Park

Central Park covers 843 acres (341 ha). Construction began in 1857, and the first areas opened to the public in late 1858. The designers, Frederick Law Olmsted and Calvert Vaux, won an 1858 competition with their Greensward Plan. The Jacqueline Kennedy Onassis Reservoir covers 106 acres between 86th and 96th streets, and the Bethesda Terrace and Fountain was completed during the Civil War. Check which parts are open, and keep the walk short on the first day.

The Metropolitan Museum of Art

The museum was incorporated in 1870 and first opened to the public on 20 February 1872, at 681 Fifth Avenue. It moved into its current building at 1000 Fifth Avenue in 1880. Its collection is about two million objects by one count. The Cloisters, at 99 Margaret Corbin Drive in Fort Tryon Park, was completed in 1938 and is dedicated to medieval art. Check the opening hours and whether tickets need booking, and check the lift access at both sites.

The Brooklyn Bridge

The Brooklyn Bridge opened on 24 May 1883. It is about 1.1 miles long including its approaches, and was designed by John A. Roebling, with his son Washington Roebling as chief engineer. Its elevated promenade is pedestrian-only and runs about 18 feet above the roadways, narrowing to about 10 feet where the main cables come down to its level. Check whether the promenade is crowded on your day, and allow for the stairs and for a long walk.

Night two

Spend the second night in the same room, and keep the last day short enough to leave a margin for the journey home.

Getting back

Take the rail back to Long Island or on to John F. Kennedy International Airport (JFK) if you are flying. Check the timetable, and keep a generous margin for check-in.